AUSTRALIAN COMPLIANCE & TECHNICAL HUB
Confidence in the details.
A practical starting point for specification, documentation and installation planning.
The right documents.
For the right configuration.
Bring your designer’s performance requirements together with the exact product system, size, glass and installation arrangement.
Documents apply to the configurations and scope they describe. Your project team confirms suitability for the site; a report for one configuration is not a blanket approval for every product.
View certifications ↗
01 / AS 2047 windows & AS 1288 glazing
When requesting AS 2047 window and door reports or AS 1288 glazing information, identify the exact system, opening type, dimensions, glazing, hardware and stated test scope. Ask your project reviewer to compare the available evidence with the wind, water and structural requirements for your site.
02 / Energy, NatHERS inputs & acoustic targets
Share the whole-window Uw and SHGC targets from your designer or energy assessor, together with the window schedule. A 7-star NatHERS rating applies to the home design, not to a window on its own. Glass-only values do not describe the whole window. Acoustic requirements also need a specified configuration and relevant supporting evidence.
03 / Reveals, sub-sills and flashings
Confirm wall construction, reveal depth, sill drainage, waterproofing, fixings and interfaces with your installer. Request the drawings for the selected system before finalising installation details.
04 / BAL, bushfire & coastal exposure
If your project has a nominated BAL or other exposure requirements, include the assessor’s documentation in your enquiry. ENGGIA must review the exact system and supporting evidence before confirming any suitable supply scope.
05 / Screens, finishes and hardware
Specify flyscreens, frame colour, opening restrictors, locking, handles and access needs. Confirm which options are available for your chosen system and opening sizes.
Certifications & standards
An overview of product-specific certification and testing.
↗REPORT CHECKLISTMatch your AS 2047 report
Check the selected system against the report scope.
↗MATERIALSProduct samples
Discuss physical samples of your selected system.
↗QUESTIONSFrequently asked questions
Review ordering, documentation and delivery questions.
↗